July 2005 photographs

July 19, 2005

Well Drilling continues for the geothermal heating and cooling system (at left). Steel beams are rising (below).

 

 

July 8, 2005

Win Boyd, President of the Burlington Public Library Board sits upon the first load of steel delivered to the library construction site. The workers are installing drainage tiling near the back footings.